Rack and hardware installation
Installation of all the rack hardware started after the racks were in place. In the rack would be installed switches, fiber box, UPS, punch panel, cable management bar, and a lot of cable when completed. The first floor rack would have a Fiber Box, and two switches; one will have a fiber module. The main fiber would come from Miller in to the first floor fiber box and then in to the switch/FX (fiber module). Then it feeds the other switch. From the first floor, a fiber 25’ jumper would go to the second floor into a fiber box. On the second floor the fiber would come out from the fiber box into the switch/FX. The other switch on the floor will have a matrix module installed in the switch. The matrix module would then connect to another switch. A total of three switches are on the second floor. The third floor is done the same way as the second, but it uses a 50’ fiber jumper from the first floor to the third.
Here is some pictures of the racks.